
CWM
Members-
Posts
14 -
Joined
-
Last visited
Everything posted by CWM
-
I got my GPS coordinates from Google Maps. If you click on a spot on the Google Maps, the coordinates will be displayed in the town name (pop up box). Enter these coordinates in the custom location in the UD app. You don't need the minus sign on the longitude coordinate. save it and you should be all set
-
Just ran the "then". It does nothing and now the device shows with no status. The "Next Scheduled Run" is also wrong. Now the admin console can not turn the light on or off. The switch is in the garage and has been controlled by the app and the admin console successfully before today. When I use the admin console to turn the switch on today, i get an error message "Request Failed"
-
I just looked at the "next scheduled run" time and it is actually 5 minutes after sunset (as it should be). It looks like maybe this will run tonight. I will post the results. Not sure why this took 3 days to get the program to execute properly. During that time, I deleted and re-wrote the program several times. I cleared the cache thinking that maybe the "sunset" variable was stored incorrectly....
-
Thanks for the quick reply. I am running 5.8.4 I am in a new house with a new Eisy and a new USB PLM. I did not do a migration. Everything talks to everything else - I can write a program for a specific execution time and it will work but if I try to run a program with an offset to sunset the next executable time is not what I specified and the program does not execute at all. I am running 24 hour time so I know it is not an AM/PM problem. How can the system create an executable from my program but the executable is not the time offset I specified? How can there be an executable that does not execute at the time specified? It does not execute at the time I specify or the time that the system chooses. If I create a program to execute at a specific time, it works just fine.
-
I have used a 994i and insteon PLM for many years with no difficulty. I have installed a new eisy and a new insteon PLM. The system seems to think it is connected. I can create programs and control devices. If I create a program to operate the switch at a specific time, it works as I would expect it to. I have written a program to turn a switch on at sunset plus 5 minutes. When I look at the summary and "next scheduled run" the time is not sunset plus 5 minutes but shows as approximately sunset plus 12 minutes. When run time arrives, the switch is not activated. I have deleted the device and the program, added them back and the same thing happens. Any help would be appreciated