Grayson Posted July 24, 2013 Posted July 24, 2013 Hi, I just received my ISY994i/PLM in the mail along with 2 access points and 2 dimmer controls and a motion control. My question is after I install the ISY/PLM should the next step be to install the access points? I would think so since the location for the dimmer switches is on a different floor than the ISY/PLM. Any other suggestions for the new install? Thanks! John
Brian H Posted July 24, 2013 Posted July 24, 2013 Installing the Access Points is a good idea. Use the built in communications test to verify communications with each other and on opposite phases of the home. Access points are not installed into My Lighting as a module.
Recommended Posts