kimbray Posted December 3, 2016 Share Posted December 3, 2016 I have two V1.0 Access Points and I am trying to determine the sync process again for phase 1 and 2 set up. I install the first one and hit sync button and LED gets bright. I install the second and hit sync and depending on outlet it starts flashing quickly or slowly blinks. I believe based on placement, when slowly blinks, it is on different phase, but wanted to validate. Thanks Link to comment Share on other sites More sharing options...
stusviews Posted December 3, 2016 Share Posted December 3, 2016 Tap the set button on the first AP four time very, very rapidly. The LED will remain bright. If it doesn't then you didn't tap four times rapidly enough. then observe the LED on the second AP. If the second LED is steady bright, then you've accomplished bridging in that direction. If the LED is blinking or dim, try a different outlet. Now reverse which is the first AP and test again. Link to comment Share on other sites More sharing options...
Teken Posted December 3, 2016 Share Posted December 3, 2016 Information Only: http://static.highspeedbackbone.net/pdf/S56-1058-%20Manual.pdf Link to comment Share on other sites More sharing options...
Recommended Posts
Archived
This topic is now archived and is closed to further replies.