Has anyone successfully used a M800S 4 button remote switch with Z-matter (Eisy 5.8). If I reset it I can sort of get through the interview and get 10 nodes, a switch, a keep alive and Association 2 to 9. None of these nodes have any status, sending a query make the admin console hang in "red busy". if I add them to a scene there are no links boxes. I can get button events "basic set" when I turn that on but can not make a program action on anything. If I "update with interview" I lose all but two nodes. Is there a better button device for zwave (the m800s is cheap)
I'm new to zwave, I used to have ~50 Insteon device, replacing them with zwave now, slowly.