Jump to content

Drosen

Members
  • Posts

    27
  • Joined

  • Last visited

Drosen's Achievements

Newbie

Newbie (1/6)

0

Reputation

  1. Have you confirmed that the 3 wire cables don't go between boxes? If they did then all the cables could be accounted for. Six cables in wirenut box. Two 3 wire cables and four 2 wire cables. One two wire cable is feeding power in. Another is exiting to another location. A third is going to one set of lights (stairwell) and the fourth to the other set of lights (foyer). Those last two cables can be identified as having their black conductor attached to a switch in the wirenut box. There is no neutral in the box containing only the three wire cables.
  2. Excellent. Thanks.
  3. Has anyone figured out ISYevent.zip that works with ISY v4.0.x? Would be a good addition. Thanks, Dave
  4. No Isy events logged and hence no audio alerts. I went back to FW 3.3.10, and Isy voice is back. Hopefully it wil be resolved before I must go forward in the firmware. For those familiar with the EventGhost logger, I was getting an event telling me that subscription to " my Isy ip was closed".
  5. Hi Michel, Slightly different issue here. I have been running EventGhost with speech and ISY plugins. ISY994i FW 3.3.10. When I upgraded FW to 4.0.3 , the logger (left pane) stopped logging events. ?? Thanks, Dave
  6. Is there some way like copy/paste to transfer data from Notepad to body of Network Resource editor? Thanks.
  7. Only thing I can think of is that the program is in a folder whose conditons are not "true".
  8. Upgraded to 2.7.13 onISY-26, using local ip. Upgrade went easily. I then added v2 thermostat adapter and it did not display add'l nodes in console. Also noticed that status was not updating. Realized that I did not set mode to off. Removed thermostat. Set thermostat off, factory reset adapter and added back using link mgmt, start linking , and had same result. Not sure how to proceed. Thank you. Dave
  9. Turn the light on. It will go off in the delay time.
  10. Yes. The program evaluates any time the switch is off and it is controlled in some way. So if it is off and turned on, the IF is false and the Else runs. Light goes off in 20 seconds. Try it. No due diligence here. My bad.
  11. I guess thats why I'm not a programmer. When that switch is turned on from the off position the program runs and turns the light out in 20 seconds. Rand has it right, i.e. 2 programs. Oops.
  12. You have it.
  13. One program can do it. The first command in the THEN causes the IF to be false and so program runs ELSE. So: If status of LIGHTS is off And control of LIGHTS is switched off Then set LIGHTS 20% Else wait 30 seconds Set LIGHTS off Thanks for the idea. I've implemented it in a few rooms.
  14. You may be wasting time looking for comm. problems here . I believe that v.35 sldimmers are problematic. I've replaced many ( as have others ) to achieve a stable network.
  15. Hi Mark, Check out this link from the Wiki: http://www.universal-devices.com/mwiki/ ... e_Door_Kit I've done this install a number of times with success. Mine varies as follows: I use red and black of the sensor to connect to IOlinc. and so don't enable trigger off. Also, change in kp button status triggers a query of relay after a 15 second wait in a program. Struggled with this as you are now. Hope this helps.
×
×