TheWabit Posted December 27, 2015 Share Posted December 27, 2015 So I have a load in a 3 way situation (2 Icon switches controlling). One of those switches I want to change to a Keypadlinc. Will the KPI play well in that scenario and what special notes should I be aware of? Thanks! Link to comment
paulbates Posted December 27, 2015 Share Posted December 27, 2015 If the keypad is not controlling the load and just controlling a scene, yes it will work fine. If the the keypad linc is actually controlling the load and: its a 6 button keypad... Yes, the on and off buttons will control the load and be joined in a scene with the other icon switch its an 8 button keypad - Yes, but the load needs to be connected to button A Paul Link to comment
stusviews Posted December 27, 2015 Share Posted December 27, 2015 Any Insteon controller can be used as one of the devices in a 3-way configuration as long as only one controller is connected to the load. Link to comment
Recommended Posts
Archived
This topic is now archived and is closed to further replies.