Jump to content
View in the app

A better way to browse. Learn more.

Universal Devices Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

3-way light

Featured Replies

Posted

I am a newbie toe the isy-99i. I came over from an insteon/smarthome 2412n. I have some knowledge and understanding of how most of this works. I am adding all of my lights right now to the isy. I have a 3-way switch that I had manually linked the switches so that when power was turned on one of the switches, both switches showed ON. When I link the devices to the ISY I used the save links option however it doesn't seem to have keep the relationship. How do I go about relinking the switches?

First look for a scene at the bottom of the My Lighting tree with a naming convention of Scene xxxx where xxxx is a number the ISY assigns to Scenes created with the keep existing links option.

 

If the Scene is not there define one ISY Scene. Add both switches to the Scene as Controllers. The ISY will cross-link the switches such that they operate as before.

  • Author

Ok, I tried creating a scene and then added the 2 devices as controllers. When I go to turn on the light from switch A, it turns on but not the light (it is wired to go to the other switch and not the load). Switch B does not change when change switch A. Likewie when I turn on Switch B (the light does goes on) but switch A does not change

"it is wired to go to the other switch and not the load)."

 

An Insteon device is not wired to another switch. Can you clarify what you mean by wired to the other switch.

  • Author

It follows the insteon switchlinc wiring for a 3-way switch and has worked that way for over a year. On switch A the load is capped and the traveler wire goes to switch B. On switch B the load goes to the light.

Is there a Red ! or any green icons to the left of either SwitchLinc node in the My Lighting tree?

 

What color are the SwitchLinc nodes listed below the Scene name?

  • Author

No red !. It has an icon with 3 green circles on the left and 2 green arrows on the top and a red square in the middle on the right

  • Author

The font on the names of the switches in the scene is red and italic

All that is correct. The only thing I can think of is the SmartLinc link records that still sit in those SwitchLincs are causing a problem. I would start clean. Delete the two SwitchLincs from the ISY. Factory reset both SwitchLincs and add them back with the default erase existing links option. Add the SwitchLincs back to the Scene.

  • Author

I just went through that process and no luck. Anyone have any ideas?

  • Author

A little more to add.....when I physically press either paddle on or off they work correctly. However in the ISY control and scene is I press ON or Off on the screen they do not work together.

You mean that the switchs now control each other?

  • Author

The switches always had controlled each other and still do when they are physically pressed. Difference now is that I can not control them properly through the ISY

When an Insteon device is turned On/Off individually with an Insteon Direct command it DOES NOT affect any devices linked to that device. To turn On/Off both devices together from the ISY click the Scene name that was used to link the SwitchLincs. Turn the Scene On/Off.

 

EDIT: added additional text to insure the action described is from an Insteon Direct command.

  • Author

There is no other scene controlling the switches. They were linked together manually when I had the 2412 acting as the controller. That is now gone. I only have the new that I am trying to create controlling the switches through the ISY. I am really confused at this point.

 

Do I need to reconnect the 2412 and unlink the switches that way. Then go back and reconnect the ISY and try to relink the switches?

NO, you do not need to reinstall the SmartLinc. Under the SmartLinc you always controlled the switches with a Scene unless you coded up Custom Commands. Under the ISY you are issuing individual Insteon Direct commands which only control the device they are sent to. You could not do that under SmartLinc. Otherwise you would have already known that Insteon Direct commands control only the device they are sent to.

 

If you want to replicate what you did with the SmartLinc use the ISY Scene to control both devices together.

 

EDIT: the ISY Scene is the one used to link the Switches under ISY.

Guest
This topic is now closed to further replies.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.