Jump to content
View in the app

A better way to browse. Learn more.

Universal Devices Forum

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

insteon intergrators in the Dallas Fort Worth, Texas area

Featured Replies

Posted

I have been told that I have a very large insteon system and in need of an intergrator to help solve my overload issues. Does anyone know of a insteon intergrator in the Dallas Fort Worth, Texas area that they can recommend?

 

Thanks

 

Bryan P. Bernard

8177235515

Care to explain some of the issues? I am sure the forum member can help get you started or the very least narrow down the culprits.

 

Teken . . .

 

 

Encrypted By: Phoenix Security Solutions

  • Author

I have been told that I have 1050 links on the PLM (?).......the Smarthome PLM maximum is 1000 links and really needs to have about 700 links to run effectively.......even though I remove some of the scenes I will still have way more than what is acceptable.....a proposed solution was to install antoher universal device box and split the links, however, this will now require the 2 universal boxes to communicate to one another......

Wow 1050 links? ! ? ! How many devices do you have and how are some of your scenes structured? Some examples may help the forum members help you cut down a few.

 

Teken

 

 

Encrypted By: Phoenix Security Solutions

First, are you sure you have that many links? You have to run the show/count links multiple times and receive the exact same result several times to be sure. Any Insteon traffic reaching the PLM during the show links process will reset the link pointer and throw off the count high or low. Best to do this at a time of day when nothing is happening on the Insteon network. Disable motion sensors by covering them if necessary.

 

And if you have added and removed devices and scenes over time, a percentage of the links in the PLM may be deleted and could be compressed out with a restore PLM.

 

-Xathros

The 2413 PLM supports a maximum of 992 link records. A count of 1050 is the result of what Xathros has already mentioned, any Insteon traffic reaching the PLM during the Show PLM Links Table processing will produce a false high or low count. As Xathros has described, run the Show PLM Links Table/Count several times until the same number is obtained on multiple runs. No Insteon traffic must reach the PLM during the Show PLM execution.

 

Also as Xathros has indicated, a PLM will accumulate duplicate and no longer used link records. A Restore Modem (PLM) will compress out these records leaving only active records. This should be done before running the Show PLM function. It is possible the PLM link record count is not an issue.

Guest
This topic is now closed to further replies.

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.