Jump to content

A few oddities after complete re do of ISY


andrew77

Recommended Posts

Posted

Hi guys;

 

I had my PLM go down and had to replace it. 

I've redone everything but I notice a few things are still hanging around from the original PLM/ISY programming.

 

With two SWLs, I press on (up) and they only go to a certain on level and stop.

I don't have them programmed to do this so I'm not sure how to make them stop.

 

Also When I press the B button on a KPL the A button comes on as well.

(I had this programmed like this before so this isn't much of a mystery except I thought by redoing everything this should have been erased.)

 

Any thoughts?

 

Drew

Posted (edited)

SwitchLincs have a preset On level that you can program into the switch.

Either use dim to 100%, fast On, reprogram the level in the device page, or hold the SwitchLinc up button until the level is set to full On, but this could happen again later.

 

I have several of my SwitchLinc dimmers do this and I have installed programs to force them to 100% when they see an On control signal.

Edited by larryllix
Posted

Thank you Larry. Its been so long since I've had to tweak or fix anything as far as the ISY is concerned I've forgotten.

 

Still not quite up to 100% so I'm sure I'll be posting more questions over the course of the day.

 

Thanks again,

Drew

Guest
This topic is now closed to further replies.

×
×
  • Create New...