Jump to content

Suitable Replacement


smokegrub

Recommended Posts

Posted

I would like to replace an Outdoor Module (2634-222) with an On/Off Module (2635-222). After I linked the On/ff module I Control-Clicked; Mac) the Outdoor Module and the Replace option did not appear. Before I start chasing this, is the On/Off Module an approved replacement?

 

Posted (edited)

I didn't think so, but before I started needlessly "chasing my tail" I decided to check with the forum.

If its not on the list when you right click to select a replace with its not.

Edited by smokegrub
Posted

I didn't think so, but before I started needlessly "chasing my tail" I decided to check with the forum.

 

Do you have lots of programs tied to that device? Also, is there a reason you intend to switch out an interior device for a outdoor rated one?

Posted

You can replace a device only with an identical device even if it operates the same (e.g., relay).

Posted

Thanks all. The reason for the desired change-out is that I have a SynchroLinc plugged into the Outdoor Module in a cellar location. My problem is that the design of the Outdoor Module is such that the SynchroLinc will only partially plug into it making a fragile connection. If I have to, I will simply modify my few programs to incorporate the replacement device.

Posted

Thanks all. The reason for the desired change-out is that I have a SynchroLinc plugged into the Outdoor Module in a cellar location. My problem is that the design of the Outdoor Module is such that the SynchroLinc will only partially plug into it making a fragile connection. If I have to, I will simply modify my few programs to incorporate the replacement device.

Why would the synchrolinc not be before the outdoor module? That way, your not cutting it off from power when the outdoor module is off - causing it to fail to respond in the ISY?

 

Could you not simply switch them around and put the synchrolinc before the outdoor module?

Posted

I will assess that option tomorrow.

 

Why would the synchrolinc not be before the outdoor module? That way, your not cutting it off from power when the outdoor module is off - causing it to fail to respond in the ISY?

Could you not simply switch them around and put the synchrolinc before the outdoor module?

Guest
This topic is now closed to further replies.

×
×
  • Create New...