Jump to content

MrBill

Members
  • Posts

    4674
  • Joined

  • Last visited

Everything posted by MrBill

  1. Based on https://wiki.universal-devices.com/index.php?title=Main_Page scroll down to the section "Front Panel LEDs/Lights" I think you're on the correct path.... with replacing the Ethernet cable. Before you make any changes to anything we should make sure you get back online. I'm guessing the IP of your ISY will change when you add a new Ethernet cable and reboot it. I use an address reservation to keep mine always on the same IP address. After you resolve problem 0, and your back online then you can determine if you should standardize the port. (or if it's even actually using 100...that might just be in the mobilinc app to force mobilinc to always use the secure settings.
  2. Why such a non-standard port assignment? It should work, but anytime you get into weird low numbered port's it's asking for unpredictability. The good news is that port 100 doesn't appear to have a modern assignment on the list of well known ports.
  3. There's a long running bug in version 5.x firmware. If the OFF value of the backlight is 0 then only 0-7 of the ON values work. You can test this using OFF value 1 and ON value 15. I think most must use 7 or less for the ON value, because this issue isn't raised often... but it definitely exists.
  4. interesting.... I always the the 200 response when it's successful.. and I've never seen the HT, that must be specific to the website your sending data to.
  5. Where do you see that? I see a dialog box that's similar when i use the Test button with a network resource.
  6. It's not common at all, I have about 20 8-button keypads scattered about (even more if I count 6 buttons that I wish I had just bought 8 buttons instead) , I've had to be careful how I set things up to make certain the back lights stay in sync. A couple of points: The only way the backlight of an non-load button can be controlled via the ISY is to put it in a scene and turn the scene on or off. Remember that a button can be included in multiple scenes. If using multiple switches don't control the load by itself. for example: if i turn on the scene for "Lamp 1" all the buttons associated with "Lamp 1" turn on. If I later use a program to just turn off the load and not the scene, the buttons become out of synch. I also use Alexa and Home Assistant as controls. I have helper programs to keep the buttons in sync and allow dimming via both platforms. How do you control the device normally? What scene's is it included in? For scenes with multiple controllers is each controller programed correctly for all members of the scene?
  7. I just re-added the nodeserver and tested. I see the same results that @macjeff posted above. (note I'm using beta version 0.2.8 of UD Mobile for iOS)
  8. I'm not the one that was having a problem above, so I wasn't trying to solve it, I made a suggestion that the person should be using "The Launcher" and linked the thread that contains it. If using "The Launcher" (start.jnlp) as I linked and you've also checked this issues that @DennisC linked then you could perhaps uninstall Java, remove any remaining working directories that Java creates, then re-install java making sure that you are using the download from https://www.java.com Or you might open a ticket by emailing support@universal-devices.com for personalized help. If you're using admin.jnlp make certain you are using the correct version. "The Launcher" (or start.jnlp) is the more modern and better method however it does require an internet connection to work.
  9. in your example above the specific difference is: If 'South - MS - Dawn Dusk' is switched Off And From 6:00:00AM To 9:30:00AM (same day) If Sunrise is at 5:21 this will run and evaluate to false because it's not in the time window, it's also false at 6:00am and 9:30 because "AND South - MS - Dawn Dusk is already off" For this to evaluate TRUE South - MS - Dawn Dusk must switch off between 6 and 9:30 AM, but it still runs false at 6 and 9:30 If 'South - MS - Dawn Dusk' is switched Off OR From 6:00:00AM To 9:30:00AM (same day) At 5:21 AM this will be true, it will also be true at 6AM and false at 9:30 this will also be true if sunrise is between 6am and 9:30am
  10. As far as we all know USER 1 - 9 is functionality that has never been implemented. Although it exists in the menu, the functionality simply doesn't work. I read and contribute here everyday, and this question gets asked from time to time, and no one has ever had other information. It seems there was some intention, but it has never been built out. For example, what would a non-admin user be able to do or not do? there's also no mechanism to determine what would or wouldn't be allowed for a "non-admin user".
  11. If you have a portal account use Locative for geofence on IOS: https://wiki.universal-devices.com/index.php?title=ISY_Portal_Node_Server_Occupancy_%26_Locative_app_Instructions
  12. Exactly. the switch doesn't say anything to the ISY, it's an Insteon firmware bug.
  13. re-read this thread: do you think that's what the issue is in this thread? I do.
  14. This is the issue.... the switch doesn't send the second press in certain cases.
  15. 5.3.2 fixed the long running Insteon 'adjust scene' bug. There's no reason not to move up to 5.3.3 if you don't have a z-wave board installed. If you have a Z-wave menu check the version. if it's 4.55.00 stick with 5.0.16C.... if it's 6.81.00 or the z-wave menu doesn't exist move on up to 5.3.3
  16. This is what I thought too... I looked briefly for that thread to link it but couldn't remember enough details to find it.
  17. Interesting. I learned something that I don't think is well documented, I actually looked before I typed.....
  18. at startup all programs are red to begin with. As they Run the Red band means the If statement evaluated false last time the program ran and the Else clause was last executed. When they turn green it mean the IF statement evaluated True last time the program ran and the Then clause was the last executed. If you see a solid red or green it means the program is currently running and is probably "waiting" for a wait to expire.
  19. Do you mean you deleted your existing portal account and are attempting to add a different account? Or does "another" mean you are trying to connect two portal accounts to the same ISY? If the latter, I don't think it's possible, I'm pretty sure the ISY will only connect to one portal account at a time whether ISY portal or mobilinc connect you only get a single choice.
  20. (my post here was not correct, self removed)
  21. I agree you need at least 15 seconds for valid testing. Another solution/ troubleshooting step might be to use "Control". i.e.: If 'Guest Bath Fan' is switched on. You could also open the event viewer (Tools > Diagnostics > Event Viewer) and change the dropdown to level 3 and show us what happens when it fails.
  22. to post the programs right click the name in the tree and pick Copy to Clipboard from the context menu, then paste each into your next reply. Be sure and post both.
  23. When i did this a few months ago it was hard to find less than 16gb in stock. my old (original) was 4 gb.
×
×
  • Create New...