Jump to content

asbril

Members
  • Posts

    4116
  • Joined

  • Last visited

Everything posted by asbril

  1. I will tomorrow . Thanks
  2. GE/Jasco light Switches ZW+
  3. I have no success so far with setting up a working Scene (I am all Zwave, no Insteon). Michel told me that Scenes work faster than programs with Zwave, so I am trying hard. The devices that I want to use are are all Zwave Plus and Scene compatible. I have been able to get a scene with the controller turning ON the other devices in the scene, but no luck with turning the devices OFF. Furthermore in that scene the controller only does the ON when I double click (with scene node 001) which is not ideal with my absolutely-non-technical (or should I say tech-hating...) wife for sure not going to remember the double click. So in short, has anyone had success setting scenes with Zwave ?
  4. I use the Holidays Google nodeserver (Polisy) and it is powerful. Once the nodeserver is connected, you enter a whole day event in your Google Calendar and then a node is created in ISY which you can program to trigger whatever you want. In fact in my Google calendar I created some 10 different sub-calendars and have a different node for each of these in my ISY. I have these trigger different programs (lights that go ON when the cleaning lady comes, wake-up for when my wife works or when I have meetings, lights that go ON or OFF when we are on a trip, etc etc.
  5. I am still working on getting the Scene working. I have succeeded in getting the Scene to ON (with physical on switch) by using the scene 001 as Controller (and using the Command for responders), but I have not figured out yet to turn OFF with physical touch on switch. To turn ONn I double click, but nothing happens when double clicking on off. I have even tried to create another scene for Off by using scene 002 as controller and setting responders to Command Off, with double or triple clicking..... but I don't get it to turn Off. As Michel pointed out to me, by using a Scene instead of a program, the reaction time is faster, but I need to figure out the Off..........
  6. The switch that I want to use as Controller has 2 Scene nodes. Do I use one of these 2 scene nodes instead of the main node ? Do I change the Controller node as Default or do I change it to Command (with ON and 100%) and what about the Responders ? Thanks as always
  7. In our master bathroom we have 3 lights (front, middle, back). I currently have a program : IF Front is ON THEN Middle ON Back ON ELSE Middle OFF Back OFF Michel pointed out to me that a Scene would be better than a program, but I have never used Scenes. I created a scene that works in my Administrative Console, but not when I manually click on Front (only sets Front ON)
  8. I would like to create a Scene (I am all Zwave) that does the following. If motion sensor X is ON then light Y is ON. By itself this is easy, and when sensor goes OFF, light will go OFF as well. HOWEVER, if light Y is already ON, then I do not want this light to go OFF when the sensor goes OFF. Is this possible in a scene, or should I do this in a program ?
  9. he is a genius and sooooo nice
  10. I did set it up, but not using it until Zwave migration is ready. As such my issue is not urgent, but I like things working. I am sure that I will work it out in time. It is basically just curiosity why I can not access Polisy settings in PG 3, which I was able to before.
  11. I don't know how, but my ISY on Polisy has gone back to admin/admin. Furthermore, when I click on Polisy Configuration (in Settings), I get message " Please wait, getting configuration " and it remains stuck on that message. Furthermore, ISY on Polisy now appears in my ISY Portal as not online and Alias "Added to account during node server purchase " is different from what it was before.
  12. Have you considered using UD Mobile instead of Mobilinc ?
  13. @Javi Am I right in remembering that eventually UD Mobile will be acessible in a browser (Chrome) ?
  14. You certainly have a point as far as distance, but speed will be at the lowest common denominator.
  15. I just read your github link. The technical stuff is not something I am familiar with, but the sympthoms seem familiar in as much as at least half of the time my AC fails to load properly and gets stuck while loading my many loads.
  16. Thanks Javi, I actually disconnected HA a few days ago and it made no difference. Tonight I only want to turn all programs off. If tomorrow morning I have no issues then we know to look in my programs. If not, then I have to look elsewhere, including again HA. I have about 80 Zwave devices and a few Kasa and LifX devices, no instean. Zwave devices can create a lot of signals, and I also have 355 programs.
  17. It is actually a brand new ISY as I had (related or non-related) issues with my old ISY. I am in the excellent hands of Michel, so one way or another it will be resolved. As the issue happens mostly in the mornings, tonight I am pausing all my programs. If the problem does not occur tomorrow morning, then I will review each of my 355 programs to find the culprit. If not, then it is something else.
  18. Thanks so much. I think that I did it. I used the URL with port 8080 and now it shows. Thanks so much to both of you. I really appreciate
  19. In other words, how do I link PG3 to ISY on Polisy ?
  20. That did it !!!!!!!!!!!!! Thanks so much !!!!!! I am in PG 3 but no ISY is connected. I want to use PG3 for ISY on Polisy and for the time being keep PG 2 on (old) ISY. I seem to have a conflict on my old ISY, with Michel thinking that I have a loop in a program. We are trying a few tricks and if these do not work, then I may have to rebuild my whole setup (about 80 Zwave devices and 355 programs) from scratch in ISY on Polisy, so I prefer not to infect PG3 by linking it to the old ISY
  21. Is there a way to delete PG 3 and re-install ?
  22. It says that PG 3 is already running, but I just don't get in it
×
×
  • Create New...